File #: 20-237    Version: 1 Name:
Type: Resolution Status: Passed
File created: 3/11/2020 Departments: PUBLIC WORKS
On agenda: 4/21/2020 Final action: 4/21/2020
Title: Adopt a resolution: A) Adopting plans and specifications, including conformance with prevailing wage scale requirements for the San Carlos Airport Runway and Taxiways Pavement Rehabilitation Project; and B) Authorizing the Director of Public Works to call for sealed proposals to be received by Tuesday, May 11, 2020 at 2:30 p.m., in the office of the Clerk of the Board of Supervisors; and C) Authorizing the Director of Public Works to extend the call for bid and bid opening for up to 60 days beyond the time and date originally set forth by the Board of Supervisor; and D) Authorizing the Director of Public Works to execute grants from the Federal Aviation Administration and California Department of Transportation for the construction of the San Carlos Airport Runway and Taxiways Pavement Rehabilitation Project.
Attachments: 1. 20200421_r_SQL_runway_pavement_rehabilitation
Special Notice / Hearing: None__
Vote Required: Majority

To: Honorable Board of Supervisors
From: James C. Porter, Director of Public Works
Subject: San Carlos Airport Runway and Taxiways Pavement Rehabilitation Project

RECOMMENDATION:
title
Adopt a resolution:

A) Adopting plans and specifications, including conformance with prevailing wage scale requirements for the San Carlos Airport Runway and Taxiways Pavement Rehabilitation Project; and

B) Authorizing the Director of Public Works to call for sealed proposals to be received by Tuesday, May 11, 2020 at 2:30 p.m., in the office of the Clerk of the Board of Supervisors; and

C) Authorizing the Director of Public Works to extend the call for bid and bid opening for up to 60 days beyond the time and date originally set forth by the Board of Supervisor; and

D) Authorizing the Director of Public Works to execute grants from the Federal Aviation Administration and California Department of Transportation for the construction of the San Carlos Airport Runway and Taxiways Pavement Rehabilitation Project.

body
BACKGROUND:
On March 29, 2011, your Board adopted Resolution No. 071336 which authorized the Director of Public Works to execute and accept grant agreements with the Federal Aviation Administration (FAA) and the California Department of Transportation (State DOT).

On July 7, 2017, the Director of Public Works executed a FAA grant to fund the design of the San Carlos Airport Runway Project and Taxiways Pavement Rehabilitation Project (Projects).

DISCUSSION:
The San Carlos Airport Runway Pavement Rehabilitation Project will include crack repair, seal coat and re-striping (approximately 50,000 square yards). Design of the Taxiways Pavement Project will eliminate one set of parallel taxiways at the San Carlos Airport to meet FAA design standards. While the project may result in a slight decrease in capacity, it will greatly enhance safety and is required to maintain FAA compliance. Recon...

Click here for full text