San Mateo County Logo
File #: 22-273    Version: 1 Name:
Type: Resolution Status: Passed
File created: 4/11/2022 Departments: COUNTY EXECUTIVE
On agenda: 4/19/2022 Final action: 4/19/2022
Title: Adopt a resolution authorizing: A) The County Executive Officer, or designee, to execute an Easement Deed to grant a utility easement to Pacific Gas & Electric Company on County-owned property commonly known as Cordilleras Mental Health Facility, identified as Assessor's Parcel Number 050-470-050 located at 200 Edmonds Rd, in the City of Redwood City ("Property"); and B) The County Executive Officer, or designee, to execute any and all notices, consents, approvals, or other documents in connection with the Easement Deed.
Attachments: 1. 20220419_r_Cordilleras PG&E Easement Deed.pdf, 2. 20220419_a_Cordilleras PG&E Easement Deed.pdf
Special Notice/Hearing: None
Vote Required: Majority

To: Honorable Board of Supervisors
From: Michael P. Callagy, County Executive
Subject: Grant of Easement Deed to Pacific Gas & Electric over property identified as Assessor's Parcel Number 050-470-050 Cordilleras Mental Health Facility

RECOMMENDATION:
title
Adopt a resolution authorizing:

A) The County Executive Officer, or designee, to execute an Easement Deed to grant a utility easement to Pacific Gas & Electric Company on County-owned property commonly known as Cordilleras Mental Health Facility, identified as Assessor's Parcel Number 050-470-050 located at 200 Edmonds Rd, in the City of Redwood City ("Property"); and

B) The County Executive Officer, or designee, to execute any and all notices, consents, approvals, or other documents in connection with the Easement Deed.

body
BACKGROUND:
Pacific Gas & Electric (PG&E) engineering and permitting process requires easement to be granted due to the new gas distribution infrastructure that will be installed as part of the Cordilleras utility upgrades. As part of the final design, a PG&E joint-trench is required to be installed from beyond the east property line of the project, down Edmonds Rd, and completing in the vicinity of the CalFire station and new service yard. The gas service infrastructure located in the joint-trench is designed to tie-into PG&E's existing gas distribution infrastructure between fire station and Canyon Oaks.

DISCUSSION:
PG&E design and engineering is completed, and construction permits issued. Before construction phase can begin, County must grant an easement deed to be filed with the County Recorder allowing PG&E access to the gas utility corridor to be installed along Edmonds Rd. from east property line boundary across the project site to an area near Canyon Oaks. PG&E land representatives have coordinated directly with County Real Property to confirm the easement terms and conditions as presented by the attached...

Click here for full text