San Mateo County Logo
File #: 22-295    Version: 1 Name:
Type: Resolution Status: Passed
File created: 2/17/2022 Departments: PUBLIC WORKS
On agenda: 4/19/2022 Final action: 4/19/2022
Title: Adopt a resolution: A) Adopting plans and specifications, including conformance with prevailing wage scale requirements for the Reconstruction of Encina Avenue from Middlefield Road to End in the North Fair Oaks Area; and B) Authorizing the Director of Public Works to call for sealed proposals to be received by Wednesday, May 18, 2022 at 2:30 p.m., in the office of the County Executive/Clerk of the Board of Supervisors; and C) Authorizing the Director of Public Works to extend the call for bids and bid opening up to sixty (60) calendar days beyond the time and date originally set forth by the Board of Supervisors.
Attachments: 1. 20220419_r_Encina Recon Adopt, 2. 0041_1_20220419_r_Encina Recon Adopt.pdf
Special Notice / Hearing: None__
Vote Required: Majority

To: Honorable Board of Supervisors
From: Ann M. Stillman, Interim Director of Public Works
Subject: Reconstruction of Encina Avenue
(County Project No. RW935; Project File No. E5044000)


RECOMMENDATION:
title
Adopt a resolution:

A) Adopting plans and specifications, including conformance with prevailing wage scale requirements for the Reconstruction of Encina Avenue from Middlefield Road to End in the North Fair Oaks Area; and

B) Authorizing the Director of Public Works to call for sealed proposals to be received by Wednesday, May 18, 2022 at 2:30 p.m., in the office of the County Executive/Clerk of the Board of Supervisors; and

C) Authorizing the Director of Public Works to extend the call for bids and bid opening up to sixty (60) calendar days beyond the time and date originally set forth by the Board of Supervisors.

body
BACKGROUND:
On June 18, 2002, this Board adopted Resolution Nos. 065329 and 065330, which established minimum road standard options and a priority list for road improvements in the North Fair Oaks area, respectively.

DISCUSSION:
Encina Avenue, from Middlefield Road to End, is the next street on the North Fair Oaks area road priority list to be considered for reconstruction. The Reconstruction of Encina Avenue from Middlefield Road to End (Project) includes one block, from Middlefield Road and Oak Drive, in which the County/Town of Atherton (Town) jurisdictional boundary is at the center of the road right-of-way. The Department surveyed all property owners along the street in the unincorporated area to determine the minimum road standards to be used in the design of the road improvements. The road standards to be used for this Project are based on the results of the property owner survey and discussions with the Town. From Oak Drive to end, and within the County limits two 9-foot wide travel lanes with 2-foot wide valley gutters on each side will be installe...

Click here for full text