File #: 22-294    Version: 1 Name:
Type: Resolution Status: Passed
File created: 2/10/2022 Departments: PUBLIC WORKS
On agenda: 4/19/2022 Final action: 4/19/2022
Title: Adopt a resolution: A) Adopting the plans and specifications, including conformance with prevailing wage scale requirements, for the Higgins Canyon Road Bridge at Mills Creek Embankment and Wingwall Repairs Project; and B) Authorizing the Director of Public Works to call for sealed bids to be received by Thursday, April 14, 2022 at 2:30pm at the office of the County Executive/Clerk of the Board of Supervisors; and C) Authorizing the Director of Public Works to extend the call for bids and bid opening up to 60 calendar days beyond the time and date originally set forth by the Board of Supervisors.
Attachments: 1. 20220419_r_adopt_Higgins Slipout Repair

Special Notice / Hearing:                         None__

      Vote Required:                         Majority

 

To:                      Honorable Board of Supervisors

From:                      Ann M. Stillman, Interim Director, Department of Public Works

Subject:                      Higgins Canyon Road Bridge at Mills Creek Embankment and Wingwall Repairs Project in the Half Moon Bay Area

                       [County Project No. RW909; Project File No. E5003]

 

 

RECOMMENDATION:

title

Adopt a resolution:

 

A)                     Adopting the plans and specifications, including conformance with prevailing wage scale requirements, for the Higgins Canyon Road Bridge at Mills Creek Embankment and Wingwall Repairs Project; and

 

B)                     Authorizing the Director of Public Works to call for sealed bids to be received by Thursday, April 14, 2022 at 2:30pm at the office of the County Executive/Clerk of the Board of Supervisors; and

 

C)                     Authorizing the Director of Public Works to extend the call for bids and bid opening up to 60 calendar days beyond the time and date originally set forth by the Board of Supervisors.

 

body

BACKGROUND:

The Higgins Canyon Road Bridge at Mills Creek Embankment and Wingwall Repairs Project (Project) is located on Higgins Canyon Road in the Half Moon Bay area of unincorporated San Mateo County. During the 2017-2018 winter storms, the bank at the southeasterly corner of the Higgins Canyon Road bridge over Mills Creek eroded and must be repaired.

 

DISCUSSION:

The Department retained Cal Engineering & Geology to develop the Project plans and specifications to repair the eroded embankment and exposed wingwall of the bridge. The improvements will include, in general, excavating soil, constructing a soldier pile concrete lagging retaining wall with ground anchors, installing a wingwall underpinning system, dewatering, removing an existing sacked concrete weir in the creek channel to improve fish passage, installing and compacting backfill, and drainage improvements. Additionally, the improvements include installing rock slope protection with soil and plantings, and erosion control features.

 

This Project complies with the California Environmental Quality Act (CEQA) and has coverage from the appropriate permitting agencies through the County’s Routine Maintenance Program.

 

County Counsel has reviewed and approved the resolution as to form.

 

FISCAL IMPACT:

The estimated construction cost for the Project is $624,000 and will be funded by Senate Bill (SB1) funds.

 

There is no impact to the General Fund.