File #: 19-429    Version: 1 Name:
Type: Resolution Status: Passed
File created: 4/4/2019 Departments: PUBLIC WORKS
On agenda: 5/14/2019 Final action:
Title: Adopt a resolution: A) Adopting the plans and specifications, including conformance with prevailing wage scale requirements, for the Coyote Point Fire Pump Project at the Coyote Point Recreation Area; and B) Authorizing the Director of Public Works to call for sealed bids to be received by Thursday, June 6, 2019 at 2:30 pm in the office of the County Manager/Clerk of the Board of Supervisors; and C) Authorizing the Director of Public Works to extend the call for bids and bid opening up to 60 calendar days beyond the time and date originally set forth by the Board of Supervisors.
Attachments: 1. 20190514_r_Fire Pump
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Special Notice / Hearing: None__
Vote Required: Majority

To: Honorable Board of Supervisors
From: James C. Porter, Director of Public Works
Subject: Coyote Point Recreation Area Fire Pump Project
[County Project No. P29L1; County Project File No. E4988000]

RECOMMENDATION:
title
Adopt a resolution:

A) Adopting the plans and specifications, including conformance with prevailing wage scale requirements, for the Coyote Point Fire Pump Project at the Coyote Point Recreation Area; and

B) Authorizing the Director of Public Works to call for sealed bids to be received by Thursday, June 6, 2019 at 2:30 pm in the office of the County Manager/Clerk of the Board of Supervisors; and

C) Authorizing the Director of Public Works to extend the call for bids and bid opening up to 60 calendar days beyond the time and date originally set forth by the Board of Supervisors.

body
BACKGROUND:
Coyote Point Recreation Area (Park) has a private water system, which provides water to several buildings, including the CuriOdyssey Museum, and other Park features such as the rifle range, a marina, fire hydrants, irrigation systems, drinking fountains, and restrooms. The system relies on water from two separate water utilities, namely the City of Burlingame and the California Water Service Company.

DISCUSSION:
Bracewell Engineering, Inc. (BEI) was contracted by the Parks Department to perform an investigation of the existing water pressures at various locations within the Park. Their investigation found that the water pressures and flow rates within the Park were inadequate to serve all the Park supported activities and uses. BEI also evaluated and determined the most appropriate and cost effective project to implement that would address the insufficient fire flows and pressures within the Park.

Based on BEI's investigation and findings, the construction of a diesel-powered fire pump system was recommended and selected as the solution to addressing low water pressures...

Click here for full text