San Mateo County Logo
File #: 16-155    Version: 1 Name:
Type: Resolution Status: Passed
File created: 5/1/2017 Departments: PUBLIC WORKS
On agenda: 5/16/2017 Final action: 5/16/2017
Title: Adopt a resolution: A) Adopting plans and specifications, including conformance with prevailing wage scale requirements, for the Coyote Point Marina 2017 Maintenance Dredging Project in the Coyote Point Recreation Area; and B) Authorizing the Director of Public Works to call for sealed proposals to be received by Wednesday, June 7, 2017 at 2:30 p.m., in the office of the County Manager/Clerk of the Board of Supervisors; and C) Authorizing the Director of Public Works to extend the call for bids and bid opening up to sixty (60) calendar days beyond the time and date originally set forth by the Board of Supervisors.
Attachments: 1. 20170516_r_Plans-Specs Coyote Point Marina Dredging
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Special Notice / Hearing: None__
Vote Required: Majority

To: Honorable Board of Supervisors
From: James C. Porter, Director of Public Works
Subject: Coyote Point Marina 2017 Maintenance Dredging
[County Project No. OD432]

RECOMMENDATION:
title
Adopt a resolution:

A) Adopting plans and specifications, including conformance with prevailing wage scale requirements, for the Coyote Point Marina 2017 Maintenance Dredging Project in the Coyote Point Recreation Area; and

B) Authorizing the Director of Public Works to call for sealed proposals to be received by Wednesday, June 7, 2017 at 2:30 p.m., in the office of the County Manager/Clerk of the Board of Supervisors; and

C) Authorizing the Director of Public Works to extend the call for bids and bid opening up to sixty (60) calendar days beyond the time and date originally set forth by the Board of Supervisors.

body
BACKGROUND:
The Coyote Point Marina periodically requires maintenance dredging due to siltation of its channels and berths from San Francisco Bay's tidal action. Previous maintenance dredging in 2010, 2006, and 2002 included the Marina's main channel, most of the secondary channels used by tenants to access their boat slips, and specific boat slips. Since the completion of those dredging episodes, a new siltation has occurred that is once again affecting navigation in portions of the Marina.

On June 28, 2016, your Board approved a contract with Transystems, Inc., to provide consultant services to prepare plans and specifications and to secure permits to dredge areas of the Marina. Both the Public Works Department and Parks Department have reviewed and approved the design plans, specifications, and cost estimates for the Coyote Point Marina 2017 Maintenance Dredging Project (Project). All necessary permits are anticipated to be obtained for the Project before the project is advertised for bid. Those permits restrict dredging to the June 1st through November 30th windo...