San Mateo County Logo
File #: 20-694    Version: 1 Name:
Type: Resolution Status: Passed
File created: 8/19/2020 Departments: PARKS
On agenda: 9/15/2020 Final action: 9/15/2020
Title: Adopt a resolution authorizing: A) The adoption of the plans and specifications, including conformance with prevailing wage scale requirements, for the Memorial Park Wastewater Collection System Replacement Project at Memorial County Park; and B) The Director of the Parks Department to call for sealed bids to be received by Wednesday, October 14, 2020 at 2:00 pm at the office of Capital Program Management, Inc.
Attachments: 1. 20200915_r_Memorial.pdf, 2. 20200915_att_SDE_Memorial Park WW 100%_200901.pdf, 3. 20200915_att_SMCP - Memorial Park Collection - Bid Doc - Spec Book R1.pdf
Special Notice / Hearing: None__
Vote Required: Majority

To: Honorable Board of Supervisors
From: Nicholas J. Calderon, Parks Director
Subject: Adoption of the Plans and Specifications for the Memorial Park Wastewater Collection System Replacement Project, and Authorizing the Director of the Parks Department to call for Sealed Bids

RECOMMENDATION:
title
Adopt a resolution authorizing:

A) The adoption of the plans and specifications, including conformance with prevailing wage scale requirements, for the Memorial Park Wastewater Collection System Replacement Project at Memorial County Park; and

B) The Director of the Parks Department to call for sealed bids to be received by Wednesday, October 14, 2020 at 2:00 pm at the office of Capital Program Management, Inc.

body
BACKGROUND:
The existing wastewater collection system at Memorial County Park ("Memorial Park") was constructed circa 1965, and consists of approximately 9,650 linear feet of gravity-fed sewer collection pipes and 56 manholes. These facilities have exceeded their useful life. In many segments, the pipes have corroded, been infiltrated by tree roots, and/or developed sags that impact system operations. For this reason, the Parks Department ("Department") has had to commit significant staffing and financial resources in recent years to maintaining the system and ensuring that no backups or leaks occur.

On January 10, 2017, your Board adopted Resolution No. 074982, which authorized an agreement with Hydroscience Engineers, Inc. for the delivery of various services, including a condition assessment of the wastewater infrastructure at Memorial Park; field surveys; geotechinical investigations; environmental analysis and permitting requirements (California Environmental Quality Act compliance); and a feasibility study regarding the overhaul of Memorial Park's wastewater treatment plant and collection system.

Hydroscience Engineers, Inc.'s feasibility study determined that the park's existing wa...

Click here for full text