Skip to main content
San Mateo County Logo
File #: 25-942    Version: 1 Name:
Type: Resolution Status: Agenda Ready
File created: 9/30/2025 Departments: PUBLIC WORKS
On agenda: 11/4/2025 Final action:
Title: Adopt a resolution authorizing Amendment No. 1 to the agreement with Lotus Water to provide on-call flood control, drainage system study, environmental protection, stormwater management, and design services for various County projects, extending the agreement term through November 13, 2028, and increasing the amount by $500,000 to an amount not to exceed $1,500,000.
Attachments: 1. 20251104_r_Lotus Water_Amendment 1, 2. 20251104_a_Lotus Water_Amendment 1
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Special Notice / Hearing: None__
Vote Required: Majority

To: Honorable Board of Supervisors
From: Ann M. Stillman, Director of Public Works
Subject: Amendment to the Agreement with Lotus Water for the 2023 On-Call Engineering and Professional Services

RECOMMENDATION:
title
Adopt a resolution authorizing Amendment No. 1 to the agreement with Lotus Water to provide on-call flood control, drainage system study, environmental protection, stormwater management, and design services for various County projects, extending the agreement term through November 13, 2028, and increasing the amount by $500,000 to an amount not to exceed $1,500,000.

body
BACKGROUND:
On November 14, 2023, this Board adopted Resolution No. 080039(i), which authorized an on-call agreement with Lotus Water to provide flood control, drainage system study, environmental protection, stormwater management, and design services in an amount not-to-exceed $1,000,000 and for a period of three (3) years through November 13, 2026.

DISCUSSION:
Amendment No. 1 increases the not-to-exceed amount of the Agreement to $1,500,000. Lotus Water has performed on-call services for the Entrada Way Slip-out Project (Project), as well as other various County projects through Task Orders issued by the Department of Public Works (Department). Additional outreach efforts, complex design and permitting issues related to the Project require additional efforts from Lotus Water to analyze and complete the final design. The Department recommends Amendment No. 1 be executed to provide continued design services for the Project and other various County on-call projects.

The Department has coordinated with Lotus Water regarding the requested increase and time extension and is recommending that Amendment No.1 be executed to allow for continued needed services. Amendment No. 1 increases the not-to-exceed amount of the Agreement by $500,000 and extends the term through November 13, 2028.

The County Attorne...