San Mateo County Logo
File #: 19-430    Version: 1 Name:
Type: Resolution Status: Passed
File created: 4/10/2019 Departments: PUBLIC WORKS
On agenda: 5/14/2019 Final action:
Title: Adopt a resolution: A) Adopting plans and specifications, including conformance with prevailing wage scale requirements for the Reconstruction of A Street and Second (2nd) Avenue - Colma Area; and B) Authorizing the Director of Public Works to call for sealed proposals to be received by Thursday, June 6, 2019 at 2:30 p.m., in the office of the County Manager/Clerk of the Board of Supervisors; and C) Authorizing the Director of Public Works to extend the call for bids and bid opening up to sixty (60) calendar days beyond the time and date originally set forth by the Board of Supervisors.
Attachments: 1. 20190514_r_Reconstruction of A Street
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Special Notice / Hearing: None__
Vote Required: Majority

To: Honorable Board of Supervisors

From: James C. Porter, Director of Public Works
Subject: Reconstruction of A Street and Second (2nd) Avenue
[County Project No. RW903; Project File No. E4996]


RECOMMENDATION:
title
Adopt a resolution:

A) Adopting plans and specifications, including conformance with prevailing wage scale requirements for the Reconstruction of A Street and Second (2nd) Avenue - Colma Area; and

B) Authorizing the Director of Public Works to call for sealed proposals to be received by Thursday, June 6, 2019 at 2:30 p.m., in the office of the County Manager/Clerk of the Board of Supervisors; and

C) Authorizing the Director of Public Works to extend the call for bids and bid opening up to sixty (60) calendar days beyond the time and date originally set forth by the Board of Supervisors.

body
BACKGROUND:
The Department has prepared a road project list to be funded by the Senate Bill 1 (SB1) Road Maintenance and Rehabilitation Account funds allocated in FY2019-20, to be considered for approval by your Board at your May 14, 2019 Meeting. The reconstruction of A Street and Second (2nd) Avenue is a project on the SB1 project list.

DISCUSSION:
A Street, from El Camino Real to Third (3rd) Avenue and Second (2nd) Avenue, from A Street to the County/Daly City limit, are the streets and limits of work for the proposed roadway reconstruction Project. A Street, within the limits of work, has an existing continuous sidewalk on one side (north side) of the street that will remain, and the Project will include the reconstruction of the roadway with minimum 11.5-foot wide travel lanes and a 3-foot wide concrete valley gutter on the south side. Second Avenue will include the reconstruction of the roadway with minimum 13.5-foot wide travel lanes and 3-foot wide concrete valley gutters on each side. The proposed Project elements and dimensions are based on the existing field ...

Click here for full text