Special Notice / Hearing: None__
Vote Required: Majority
To: Honorable Board of Supervisors
From: Ann M. Stillman, Director of Public Works
Subject: Cañada Road Pavement Preservation Project
County Project No. RW407; County Project File No. S5095
RECOMMENDATION:
title
Adopt a resolution:
A) Adopting plans and specifications, including conformance with prevailing wage scale requirements, for the Cañada Road Pavement Preservation Project; and
B) Authorizing the President of the Board to execute an agreement with VSS International, Inc., in the amount of $1,766,000 for the Cañada Road Pavement Preservation Project; and
C) Authorizing the Director of Public Works to:
1. Execute subsequent change orders to grant time extensions for project completion and payment up to a maximum aggregate amount not to exceed $176,600 or approximately 10 percent of the agreement amount; and
2. Approve payment up to the not to exceed amount of $1,942,600 for items requiring adjustment based on unit bid prices without execution of a change order.
body
BACKGROUND:
On March 26, 2024, this Board adopted Resolution No. 080259, which “streamlined” the bid process for projects to be constructed during the 2024 construction season. The projects are maintenance type projects that do not have long lead times for design, are not considered controversial requiring specific property owner input, and that do not require state or federal grant approvals that have not previously been approved by this Board, and do not require extensive permit approvals from regulatory agencies. Authorizing the Director of Public Works to develop plans and specifications and to call for bids for these types of projects at one time reduces overall project delivery schedules and reduces administrative staff time for these types of projects.
DISCUSSION:
On Thursday, May 16, 2024, bids were accepted for the Cañada Road Pavement Preservation Project (Project) and subsequently referred to Public Works for checking and recommendation. The bid of:
VSS International, Inc.
3785 Channel Drive,
West Sacramento, CA 95691
at $1,766,000 was the lowest responsible bid received for the work. The Engineer’s Estimate was $2,050,000. A summary of the bids received is attached as Exhibit “A”.
This Project complies with the California Environmental Quality Act (CEQA) and has coverage from the appropriate permitting agencies through the County’s Routine Maintenance Program.
County Attorney has reviewed and approved the resolution and agreement as to form.
FISCAL IMPACT:
The total estimated cost for construction is $1,942,600 which includes authorization for up to $176,600 in change orders as the work is bid on a unit price basis. The contingency is used to pay the contractor for any unforeseen conditions not anticipated in the construction agreement documents.
The Project is proposed to be financed by Measure W funds.
There is no impact to the General Fund.
Attachment: Exhibit “A” - Summary of Bids Received